Browse all practice questions for the Work Center Supervisor Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Work Center Supervisor Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What type of item does the "Non-Maint Supplies" menu typically encompass?
  • What does the term "CASREP" stand for?
  • According to OPNAVINST 4790.4, what is the maximum number of hours a single EGL should contain?
  • What should a Maintenance Person do if they find an MRC that they do not understand?
  • What is an MSDS for?
  • Which of the following reasons could allow for a Force Revision?
  • What is GDAPL?
  • What can work center supervisors report through the Maintenance Data System (MDS)?
  • How frequently should the PMS check 4211/001 Q-6R be performed?
  • Can a work center receive credit for a PMS check if at least 80% of the check is completed?
  • What is the maximum periodicity of a weekly (W) MRC?
  • Which item is not included in the LOEP?
  • For a Danger/Caution tag, when does the second person check the tags?
  • A list or repair parts and special tools required for the operation, overhaul and repair of equipment and components can be found in?
  • What does the acronym COSAL stand for?
  • What must be done before starting maintenance on equipment?
  • What is the scheduling interval for a quarterly MR?
  • Who has the authority to mark the Weekly PMS Schedule as completed for a PMS check?
  • What is the significance of the 4790 series form?
  • Shipboard divisions may have E7 and senior who are responsible for multiple Work Centers. These Chief Petty Officers are designated by the Commanding Officer as?
  • While reviewing your Quarterly PMS Schedule you notice S-1(), if anything, what does this signify?
  • What does the acronym MRC stand for in maintenance terminology?
  • Who typically takes the lead in conducting maintenance training sessions in a work center?
  • What form is used for Report of Discrepancy (ROD)?
  • What is the responsibility of the second person during an equipment tag-out procedure?
  • If a question exists regarding a step in a maintenance requirement, what should the Maintenance Person do?
  • What is attached to a MRC and lists identical items at different locations?
  • What is the primary focus of the Afloat Safety Manual (5100.19E)?
  • During what situation would an Initial CASREP typically be filled out?
  • What does "Man-Hours" on the MRC card refer to?
  • Which Tag-Out Log would a Supply Department DCPO utilize for a DC related tag-out?
  • Which of the following is NOT an example of an IEM MRC?
  • Can parts be ordered under an AEL without Department Head approval?
  • At what interval can an annual Maintenance Review (MR) be scheduled?
  • Given the information [00883] Tester, 500V, 100MO, SCAT-4452, what number locates the Tester in the SPMIG?
  • How many types of CASREPs exist?
  • Equipment should be placed in IEM Status II when...
  • Who is designated as the 3-M system functional manager within the command?
  • What is the best way to check the status of parts ordered for your work center?
  • At what interval can a monthly MR be scheduled?
  • How often should Maintenance Personnel review their MRCs to ensure compliance?
  • If a MRC has a periodicity of 2M, how often should it be accomplished?
  • Which responsibility does not belong to the Maintenance Person?
  • In the context of shipboard operations, what does the term "tagout" refer to?
  • What is the purpose of a Quality Deficiency Report?
  • What happens if a maintenance person is not assigned any maintenance check for greater than 3 quarters in SKED?
  • What does the acronym IEM stand for?
  • What is the primary purpose of the Quarterly board?
  • What indicates the end of IEM status on a schedule?
  • Who has final approval on parts over $2,000 but less than $5,000?
  • If a job priority in OMMS-NG is categorized as Highly Desirable, what type of CASREP is required?
  • Which of the following documents is necessary for approving an order under the Open Purchase procedure?
  • What type of documentation assists in improving maintenance policies and procedures?
  • How frequently should PMS check 6641/005 M-9R be carried out?
  • Is it true that the independent reviewer only needs to be familiar with the equipment being tagged to sign the Tag Sheet?
  • What is required when a maintenance action is not fully accomplished?
  • In the context of the 3-M System, what does PMS stand for?
  • Who may authorize Danger/Caution tags?
  • Which action does SKED take for unused maintenance personnel after a specific period?
  • The Department Head finalizing the Cycle board constitutes the approval signature. Is this statement true or false?
  • What does DLR stand for?
  • What form should be filled out to request a replacement for a lost or damaged classified MRC?
  • Where should the CASREP DTG and Serial be documented when submitting a 2K in OMMS-NG with a priority of Highly Desirable, Essential, or Mandatory?
  • If A-1 MRC is completed but Q-1 must be rescheduled, how should this be handled?
  • What form is used for Quality Deficiency Report (QDR)?
  • How often is a Force Revision (FR) typically produced?
  • What is the maximum periodicity of a 3W MRC?
  • Is it true that the only requirement for a DC Maintenance Person is to be DC qualified?
  • What is the role of the Commanding Officer concerning PMS?
  • What does the acronym HAZMAT stand for?
  • SNAP II was replaced by which system?
  • What does the statement "MR was satisfied by a higher level test" imply?
  • Where do Maintenance Personnel find their PMS assignments?
  • What does the cent sign (¢) signify about a specific MR on the Quarterly board?
  • Which document is crucial for reporting supply discrepancies?
  • When an MRC applies to multiple like equipment, how are they listed to ensure PMS is conducted on each item?
  • Is the statement true or false? An OPNAV 4790/CK is used to report discrepancies in the PMS system?
  • PMS schedules (boards) are produced using what computer program?
  • What does a vertical line signify in relation to MIP status?
  • What does the unit of issue "PK" stand for?
  • Which form is used to document the installation of new equipment?
  • What color is a Classified maintenance requirement card?
  • What is the function of a "schedule verification" in SKED?
  • Who holds ultimate responsibility for the effective functioning of the 3-M system within the command?
  • Which state does a monthly MR reach once it is scheduled?
  • Who is primarily responsible for overseeing the effectiveness of the Planned Maintenance System?
  • The SCLSIS database is used to determine which of the following?
  • Who is the first individual to sign a DANGER Tag?
  • What does the dotted red line through the MR indicate?
  • What does the acronym 3M stand for?
  • What is the role of the Division Officer in the context of PMS?
  • What does 5S refer to in the procurement process?
  • What does the term 'divisional readiness' refer to in shipboard management?
  • What does the acronym MRC stand for?
  • How often and based on what document is the Quarterly Board updated?
  • When submitting a 2K with a CASREP, what specific information must be included about the CASREP?
  • In the context of parts validity, what does 5G indicate?
  • What is the production (birth) date of an MRC card with SYSCOM MRC Control Number A7 4ABG N?
  • What does a solid blue line through the MR signify during IEM status?
  • For a job classified as Mandatory in OMMS-NG, what category of CASREP must be submitted?
  • How often can a semi-annual MR be scheduled?
  • When using Open Purchase, what is the maximum dollar amount allowed for a single request?
  • When is equipment permitted to be operated with a red tag attached?
  • To perform an equipment validation, what is the first step you should take?
  • In SKED, what does M-1(#R-1) signify on the quarterly board?
  • Which form is utilized for logistical reporting?
  • The purpose of a Tag out Audit is primarily to ensure what?
  • How is the start of IEM indicated on the Quarterly board?
  • Which group oversees the development and implementation of maintenance procedures on board?
  • Is the RPPO responsible for maintaining a Work Center RPPO log?
  • What is the initial step to create a JSN in OMMS-NG?
  • In the context of work center maintenance, what does PMS stand for?
  • What is chapter C1 in the Afloat Safety Manual (5100.19E) primarily about?
  • What type of maintenance task must be marked as complete in SKED?
  • What is indicated by a periodicity marking of 1M?
  • Which of the following is an example of a consumable item ordered through the "Non-Maint Supplies" menu in OMMS?
  • What type of CASREP report is submitted when a system has been restored to full operational status?
  • What does the acronym RAR stand for?
  • Who is responsible for reviewing and signing off on the Weekly PMS Schedule?
  • What does the acronym MIP stand for?
  • Which document provides instructions and references required for use in the 3-M System?
  • What does a SCAT code identify?
  • An Advance Change Notice (ACN) would be received when?
  • What is the purpose of a Caution Tag in maintenance operations?
  • What must you bring to order a DLR?
  • A job priority of Essential in OMMS-NG requires which category of CASREP?
  • Which term refers to the time needed to perform required maintenance activities?
  • What does MSDS stand for?
  • What is the purpose of a memo regarding non-accomplished maintenance?
  • What is the primary purpose of the 3-M System?
  • Is maintaining a Work Center RPPO log optional?
  • What does a "C" beside a MIP number on the LOEP indicate?
  • What is the minimum information required when entering a 2K in OMMS-NG?
  • How often are Danger and Caution Tag out Audits conducted?
  • What does OPNAVINST 4790.4 (Series) refer to?
  • Which mode must SKED be in to mark a check as complete?
  • What is the purpose of a DD Form 200?
  • How should changes to parts or materials be handled according to policy?
  • What is a QDR?
  • What is the maximum number of Quarters a cycle board can be used for?
  • The Ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve ____________ equipment operational readiness?
  • What does the CASREP category indicate for a Highly Desirable job priority?
  • What form is utilized to report discrepancies or deficiencies in the PMS system?
  • What term describes the mandatory checks and tasks to maintain equipment functionality within the 3-M system?
  • Are weekly Maintenance Requests (MR) displayed on the Quarterly Board?
  • What minimum information is required when entering a 2K in OMMS-NG?
  • Which of the following is a responsibility of the Work Center Supervisor?
  • Where can information on proper PPE for using HAZMAT be found?
  • What does OPNAVINST 5100.19 (Series) pertain to?
  • Who is required to review and sign the accountability log?
  • What does the term "remain in place item" suggest?
  • Can an EGL contain more than one single day’s work?
  • In PMS procedures, what does the acronym PMS stand for?
  • Who is designated as the Ship's 3-M Manager?
  • Who is responsible for notifying the supervisor about tool availability?
  • What is the maximum periodicity of a 2W MRC?
  • Who is the final approving authority for the "Remain in Place" (RIP) chit?
  • Where can the ships underway schedule be viewed?
  • What is one key function of the MRC?
  • Which of the following would be the correct quarter scheduling for the 18M-1 as you are verifying your PMS Schedules that started on the first quarter?
  • Which of the following is true about rescheduling maintenance tasks?
  • What does the "Y" in the SYSCOM CONTROL NO of MIP MRC A-1 signify?
  • What is the basic rule when signing receipts?
  • In the "Procedure" block, workcenter supervisors may line out the non-applicable line items (Alternate procedures) that do not pertain to current equipment/configuration when the step is followed with the words "If applicable" or a note identifying steps to be omitted. Is this statement true or false?
  • Which officer is primarily responsible for the safety protocol within the ship's command structure?
  • Which type of maintenance focuses on restoring equipment to operational status after a failure?
  • What is the primary purpose of the LOEP?
  • How many weeks does a Quarterly board cover?
  • What does a blue line through a schedule MR during an IEM period signify?
  • How is a Job Sequence Number (JSN) created in OMMS-NG?
  • Once the Quarterly PMS Schedule has been authorized, how often must it be updated?
  • Which document contains a list of MIPs assigned to a specific work center?
  • What form is used for Mandatory Turn-in?
  • What symbol indicates mandatory maintenance is required and must be accomplished concurrently?
  • Submitting a 4790/CK for a newly installed piece of equipment will initiate support to include?
  • Can you share an APL with another work center performing maintenance on the same equipment?
  • What is the primary purpose of the PMS (Planned Maintenance System)?
  • Which document is NOT part of the routine PMS protocol?
  • Who is the Authorizing Officer for an equipment tagout for Engineering while underway?
  • Who verifies the information entered into the PMS system?
  • Which of the following is an example of an AEL?
  • From the MRC SYSCOM CONTROL NO "S 24 DWYG N", what can be inferred about the MRC?
  • What is chapter C23 in the Afloat Safety Manual?
  • Which CASREP category is not required for a job priority classified as Essential?
  • When is equipment placed in IEM Status I?
  • Which modification is not allowed for MRCs by shipboard personnel?
  • In which document would you find the information about HAZMAT PPE?
  • Which piece of information is NOT included in the List Of Effective Pages (LOEP)?
  • Which publication or CD-ROM is used for proper identification of parts ordered?
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy